On November 23, 2026, XiKong Zhizao launched China's first nuclear-grade refractory metal electron beam point-printing dedicated machine. The equipment is currently the only electron beam system in China covering tungsten, molybdenum, tantalum, niobium and their alloy systems, and has completed forming validation of pure tungsten parts with density above 99.7% and no internal cracks. The dedicated machine is based on the M100 electron beam selective melting point-printing equipment and leverages the high vacuum, high preheating and low stress characteristics of electron beam selective melting technology to address the forming difficulties of tungsten, including its melting point of 3422°C, high ductile-brittle transition temperature and large thermal stress. Through processes such as four-direction alternating preheating, secondary melting and conformal preheating, it reduces the risk of cracking and lack of fusion, and has completed process validation for materials including pure tungsten, pure molybdenum, tungsten-molybdenum-tantalum-niobium refractory high-entropy alloys and molybdenum-rhenium alloys, corresponding to the main material systems for fusion reactor first walls, divertors and neutron source targets. On the domestic nuclear fusion facility side, the Southwestern Institute of Physics, China National Nuclear Corporation, has built the HL-1, HL-2 and HL-3 tokamaks and undertaken the development of key ITER components, accumulating technical expertise in conventional manufacturing routes such as tungsten-copper divertors. XiKong Zhizao's dedicated machine provides a domestic path for nuclear-grade refractory metal components, from material process validation and complex-structure trial production to engineering component delivery. Next, the company will carry out trial production of engineering components and promote equipment and process adaptation and validation for engineering customers.