On October 28, 2026, 3D Systems and Precision Resource, a precision stamping and additive manufacturing service provider, jointly announced that the latter has officially broken ground on two new additive manufacturing production facilities: an expansion of its Huntington Beach, California plant that will double existing industrial additive manufacturing capacity, and a new facility in Shelton, Connecticut, the company's first additive manufacturing site in that location. Both facilities are expected to begin operations in the first quarter of 2027, coinciding with Precision Resource's 80th anniversary. The new plants will deploy DMP Flex 350 Triple three-laser metal 3D printing systems and add in-house heat treatment and complex machining capabilities, creating an integrated path from printing to finished parts.
Headquartered in Shelton, Connecticut, and founded in 1947, Precision Resource serves the automotive, heavy industry, medical, semiconductor, commercial, and defense markets. It already has precision blanking, grinding, lapping, laser powder bed fusion, heat treatment, and complex machining capabilities, and previously deployed an AS9100-certified DMP Flex 350 at Huntington Beach. The newly introduced three-laser system continues the same platform architecture, allowing powder parameter packages and grade-matching systems to be reused directly, reducing the time cost of process validation during the new plants' ramp-up phase. Once completed, the two facilities will form a North American metal additive manufacturing production network with existing sites, providing capacity redundancy and geographic backup for commercial and defense customers.
For the metal powder supply chain, the signal sent by this expansion lies in a structural shift on the demand side: the batch deployment of three-laser LPBF equipment means powder consumption per plant will rise significantly, while stringent requirements from defense and commercial customers for batch consistency and certification documentation will push the competitive threshold for powder suppliers from "able to supply" to "able to certify." The "interconnected additive manufacturing network" mentioned by Chris Gratton, Precision Resource's director of additive and equipment operations, essentially requires powder supply to maintain stable output under the same quality system across multiple plant locations.
Value for powder buyers: ① The commissioning of multiple three-laser LPBF machines will directly drive increased procurement of standard-grade powders such as Ti6Al4V, stainless steel, and nickel-based superalloys; the DMP 350 platform's powder parameter packages are mature and the grade-matching threshold is low; ② Supply chains serving defense and commercial customers have high requirements for powder batch consistency and ASTM/AMS certification documentation, so powder suppliers with certification capabilities will benefit first; ③ Watch the powder supplier certification window ahead of the first-quarter 2027 commissioning and lock in sample submission and audit schedules in advance.
📰 News Source
This article was translated from a Chinese source.
Source URL not available
Show Chinese original
Precision Resource动工新建两座增材制造生产工厂:携手3D Systems部署DMP Flex 350 Triple三激光系统
3D Systems与精密冲压及增材制造服务商Precision Resource于2026年10月28日联合宣布,后者正式破土动工两座新的增材制造生产设施:加州亨廷顿比奇工厂扩建项目将把现有工业增材制造产能翻倍,康涅狄格州谢尔顿新厂则是该公司在当地的首座增材制造基地。两座设施预计2027年第一季度投入运营,时间节点恰逢Precision Resource成立80周年。新厂将部署DMP Flex 350 Triple三激光金属3D打印系统,并新增厂内热处理与复杂机加工能力,打通从打印到成品零件的集成化路径。
Precision Resource总部位于康涅狄格州谢尔顿,创立于1947年,服务汽车、重工、医疗、半导体、商用与国防市场,已具备精密冲裁、磨削、研磨、激光粉末床熔融、热处理与复杂机加工能力,此前在亨廷顿比奇已部署通过AS9100认证的DMP Flex 350设备。此次引进的三激光系统延续同一平台架构,粉末参数包与牌号匹配体系可直接复用,降低了新厂爬坡阶段在工艺验证上的时间成本。两座设施建成后,将与现有基地构成北美金属增材制造生产网络,为商用与国防客户提供产能冗余与地理备份。
对金属粉末供应链而言,这一扩建释放的信号在于需求端的结构性变化:三激光LPBF设备的批量部署意味着单厂粉末消耗量显著抬升,而国防与商用客户对批次一致性和认证文件的硬性要求,将把粉末供应商的竞争门槛从“能供”推向“能认证”。Precision Resource增材与设备运营总监Chris Gratton所提的“互联增材制造网络”,本质上要求粉末供应在多地工厂间保持同一质量体系下的稳定输出。
对粉末采购商的价值:① 多台三激光LPBF设备投运将直接带动Ti6Al4V、不锈钢、镍基高温合金等标准牌号粉末采购放量,DMP 350平台粉末参数包成熟、牌号匹配门槛低;② 面向国防与商用客户的供应链对粉末批次一致性与ASTM/AMS认证文件要求高,具备认证能力的粉末供应商优先受益;③ 关注2027年第一季度投运前的粉末供应商认证窗口,提前锁定送样与审核排期。